Building approval requirements · Lagos State

Lagos building approval requirements: see your exact document list in 30 seconds.

Every building needs a different set of documents. Answer four quick questions and see exactly what Lagos will ask you for, what we prepare and what you provide.

  • Based on the Lagos State Physical Planning Permit Regulations and our approval experience.
  • Covers homes, flats, commercial, industrial and other buildings.
  • Send your checklist to WhatsApp and get your price the same day.

RC 7632487 · SURCON registered surveyor · COREN registered engineer · Pay only into the company account

Floor plan drawing prepared by OME Buildway for building approval in Lagos
Floor plan drawn by OME Buildway for approval

The documents required for building approval in Lagos State are: a survey plan, architectural drawings with site plan, LUPAR, electrical and mechanical drawings, proof of ownership, tax clearance and land use charge receipt. Buildings of two floors and above, or on swampy ground, also need structural drawings, calculation sheets, COREN letters and a soil test report. Large or non residential buildings may also need a PPTR, an EIA, and for petrol stations, police and fire clearance.

Requirements checker

Find your documents.

Your documents

We prepare

    You provide

      Send me this checklist on WhatsApp
      The full list

      Building approval requirements by building type.

      DocumentBungalow, firm groundBungalow swampy, or two floorsThree floors and aboveFlats over 8 units, commercial, industrial, institutional
      Survey plan✓✓✓✓
      Architectural drawings and site plan✓✓✓✓
      LUPAR (Land Use Planning and Analysis Report)✓✓✓✓
      Electrical drawings✓✓✓✓
      Mechanical drawings✓✓✓✓
      Structural drawings and calculation sheets✓✓✓
      COREN structural stability and supervision letters✓✓✓
      Soil test (subsoil investigation) report✓✓✓
      PPTR (Physical Planning Technical Report)Land of 1 hectare or more✓
      EIA (Environmental Impact Assessment)Large industrial, commercial centres, mass housing, tank farms
      Proof of ownership (C of O, Governor’s Consent or deed)✓✓✓✓
      Tax clearance and land use charge receipt✓✓✓✓
      • Company applying? Add the certificate of incorporation, tax clearance for the company and two directors, and PAYE returns.
      • Petrol or gas station? Add police clearance and fire service clearance.
      • Already built? As built drawings replace new drawings, plus a structural stability letter from a registered engineer, and an integrity test for buildings over two floors. See regularisation.

      Source: Lagos State Physical Planning Permit Regulations and OME Buildway’s approval experience. District offices can ask for extra items in some cases; we check your exact list before we start.

      Who does what

      We prepare the technical documents. You provide the personal ones.

      OME Buildway prepares

      • Survey plan (SURCON registered surveyor)
      • Architectural drawings, site plan and LUPAR
      • Electrical and mechanical drawings
      • Structural drawings, calculation sheets and COREN letters
      • Soil test report, PPTR and EIA where needed
      • Submission on EPPPS and follow up to your permit

      You provide

      • Proof of ownership: C of O, Governor’s Consent or deed
      • Tax clearance
      • Land use charge receipt
      • For companies: CAC certificate, directors’ tax clearance, PAYE returns

      Living abroad and unsure about tax documents? We explain your options.

      Why it matters

      One missing document can send your file back.

      Online, but strict

      Approval is now on EPPPS. When one document is wrong, the file comes back and has to be corrected and uploaded again.

      One company, every document

      No chasing an architect, engineer, surveyor and town planner separately. We prepare the full set for your building.

      Free corrections

      Corrections to our documents are always free. On Full Approval, we handle every query ourselves.

      Questions

      Approval requirements, answered straight.

      What documents are required for building plan approval in Lagos State?

      Every building needs a survey plan, architectural drawings with site plan, LUPAR, electrical and mechanical drawings, proof of ownership, tax clearance and land use charge receipt. Two floors and above or swampy ground add structural drawings, calculation sheets, COREN letters and a soil test report.

      Do I need electrical and mechanical drawings for a bungalow?

      Yes. Electrical and mechanical drawings are required for every type of building, including bungalows.

      When do I need a soil test for approval?

      On swampy or wet ground, and for buildings of two floors and above. In coastal Lagos, it is also wise on land that looks firm.

      When do I need a PPTR?

      For residential land of 1 hectare or more, blocks with more than 8 family units, and non residential buildings such as offices, shops, factories, warehouses, schools, worship centres, event centres and petrol stations.

      When do I need an EIA?

      For large developments such as large industrial projects, tank farms, gas storage, large tertiary institutions, commercial centres and mass housing estates, or when directed.

      What extra documents does a company need?

      The certificate of incorporation, tax clearance for the company and two of its directors, and PAYE returns, in addition to the building documents.

      What if my building is already built?

      You need as built drawings, a structural stability letter from a registered engineer and, for buildings over two floors, an integrity test, plus the usual title and tax documents. This is called regularisation.

      Can you prepare all the documents for me?

      Yes. We prepare every technical document and submit on EPPPS. You only provide your title, tax clearance and land use charge receipt.

      Got your list? Let us prepare every document.

      Office: 8a Sanyaolu Street, Oregun, Ikeja, Lagos · Phone: 0707 736 9416 · info@omebuildway.com

      Built for More. Design. Approve. Build. Develop.

      OME Buildway Contracting Limited
      8a Sanyaolu Street, Oregun, Ikeja, Lagos
      0707 736 9416
      info@omebuildway.com
      RC 7632487

      Office hours

      Mon to Fri 8am to 6pm
      Sat 9am to 2pm
      Sun closed

      Follow us

      © 2026 OME Buildway Contracting Limited. All rights reserved. Privacy policy · Cookie settings