Building approval · Lagos

Get your building approved in Lagos State. We handle EPPPS for you.

Lagos approval is now fully online, and one mistake can send your whole file back. We prepare every document, submit it, defend it and follow it until your permit is issued.

  • Fixed price you see before you pay. From ₦925,000 with survey plan included.
  • Corrections to our documents are always free.
  • Apply from anywhere in the world. You don’t need to visit any office.

RC 7632487 · SURCON registered surveyor · COREN registered engineer · Pay only into the company account

Floor plan drawing prepared by OME Buildway for building approval in Lagos
Floor plan drawn by OME Buildway for approval

Building approval in Lagos State, also called a building permit or planning permit, is issued by the Lagos State Physical Planning Permit Authority (LASPPPA) and is now applied for online through the Electronic Physical Planning Permit Processing System (EPPPS). As of November 2026, OME Buildway’s fees for a 3 bedroom bungalow start from ₦925,000 including the survey plan, and from ₦1,710,000 for a 4 bedroom duplex. Government fees are paid separately, straight to Lagos State.

30+Approvals completed
FreeCorrections to our documents
20Lagos LGAs covered
15 minWhatsApp reply in office hours
As featured in BusinessDay Registered with CACSURCONCOREN
Why people get stuck

Online doesn’t mean easy. One correction can restart your file.

Since April 2026, every Lagos planning permit goes through EPPPS. It looks simple. But when one document has a problem, the file comes back, documents are corrected, printed, signed and uploaded again. One correction often leads to another. Many applicants can’t explain the technical points, so their file sits there for months.

Doing it yourself

  • You find and pay four to eight separate professionals.
  • Every correction means new prints, new signatures and a new upload, and you carry each query back and forth.
  • You have to defend technical drawings you didn’t prepare.
  • No end date. Corrections can drag on before you even reach payment.
  • Fees paid on a rejected file are not refunded.

With OME Buildway

  • One company and one fixed price for every document.
  • Drawings prepared to Lagos approval standards before submission.
  • We submit on EPPPS, answer every query and defend your file.
  • We see every query first hand and fix it straight away, free.
  • Some of our recent approvals were completed within a month of submission.
Packages

Pick your package. See your price.

Prices below are for a 3 bedroom bungalow on firm ground in our lowest priced zone, with the survey plan for one plot included. Your exact price depends on your building and your LGA (tables below).

Documents Only

From ₦925,000

You get the papers. You submit them.

  • Survey plan for one plot
  • Architectural drawings and site plan
  • LUPAR, plus structural drawings and soil test where needed
  • Free corrections to our documents (you bring each query back to us)
  • Ready in about 3 weeks

Result: a complete, signed set in your hands.

Choose Documents Only
Recommended
Full Approval

From ₦1,225,000

You relax. We get your permit.

  • Everything in Documents Only, with 10% off the documents
  • We submit on EPPPS for you
  • We answer every query and defend your file
  • We see every query first hand, so corrections are fast and free
  • WhatsApp updates until your permit is issued

Result: your building permit, without the stress.

Choose Full Approval
Priority

From ₦1,740,000

You need it fast. We put you first.

  • Everything in Full Approval
  • All documents in 2 to 3 days
  • 3D views of your building
  • Extra revisions and a dedicated contact
  • Your file submitted first

Result: your file submitted first, with 3D views to share.

Choose Priority

Building permit cost for a 3 bedroom bungalow, by zone

PackageZone AZone BZone CZone D
Documents Only₦2,075,000₦1,500,000₦1,250,000₦925,000
Full Approval₦2,495,000₦1,800,000₦1,550,000₦1,225,000
Priority₦3,360,000₦2,460,000₦2,150,000₦1,740,000

Building permit cost for a 4 bedroom duplex, by zone (soil test included)

PackageZone AZone BZone CZone D
Documents Only₦3,250,000₦2,390,000₦2,090,000₦1,710,000
Full Approval₦4,140,000₦2,860,000₦2,560,000₦1,970,000
Priority₦5,880,000₦4,050,000₦3,680,000₦2,890,000

Which zone is my land in?

Zone A
Apapa, Eti Osa, Ikeja, Lagos Island, and waterfront properties
Zone B
Kosofe, Lagos Mainland, Mushin, Surulere, Somolu
Zone C
Agege, Alimosho, Amuwo Odofin, Ibeju Lekki, Ifako Ijaiye, Oshodi Isolo, Ojo
Zone D
Ajeromi Ifelodun, Badagry, Epe, Ikorodu
  • Already have a registered survey plan? Take off the survey: Zone A ₦1,575,000 · B ₦1,000,000 · C ₦750,000 · D ₦425,000.
  • Land bigger than one plot, a bigger building, or commercial use? We quote it on WhatsApp the same day.
  • Government fees (assessment, advance tax and levies) are separate. You pay them straight to Lagos State through the bank, and we tell you the amount before you pay.
Why files get rejected

Most rejections come down to small technical points.

From our experience on Lagos approvals, these are the problems we see most. We check every one before your file goes in.

01

Drawings below approval standard

Plans that don’t follow Lagos planning rules for the area or building type.

02

No proper setback

The building sits too close to the boundary, road or neighbours.

03

Drawings not properly labelled

Missing or unclear lettering, dimensions and titles on the sheets.

04

Rooms without cross ventilation

Rooms designed without the window openings the rules require.

Tax issues also hold files back: the Lagos commissioner has warned that tax payment discrepancies can stall approval. We check your tax documents before submission.

What you need

Building plan approval documents Lagos asks for.

Bungalow on firm ground

  • Survey plan
  • Architectural drawings and site plan
  • LUPAR (Land Use Planning and Analysis Report)
  • Proof of ownership (C of O, Governor’s Consent or deed)
  • Tax clearance and land use charge receipt

Swampy ground, or two floors and above

  • Everything on the left
  • Structural drawings and calculation sheets
  • COREN engineer’s letters (structural stability and supervision)
  • Soil test (subsoil investigation) report
  • Bigger buildings may also need electrical and mechanical drawings, a PPTR or an EIA
How it works

How to get a planning permit on EPPPS. Four steps, we do the hard part.

STEP 1

Send your survey plan

Tell us your LGA and what you want to build, on WhatsApp. You get your exact price the same day.

STEP 2

Approve and pay

You get a written quote. You pay into the company account only.

STEP 3

We design and prepare

You approve the layout. We prepare, sign and seal every document to approval standard.

STEP 4

We submit and follow up

We submit on EPPPS, answer every query and keep you updated until your permit is issued.

After your permit

A permit is not the end. We handle what comes next.

Before and during construction, Lagos State Building Control Agency (LASBCA) has its own steps. Our COREN registered engineer handles them with you.

Letter of authorisation to build

The go ahead from LASBCA before work starts on site.

Stage certification

Inspections and sign off at each stage of construction.

Certificate of fitness for habitation

Needed before anyone moves into the building.

The risk

What it costs to build without approval.

Penalty or removal

Building without a permit can mean a penalty of 4 times the assessment fee, or removal of the structure within 21 days of notice.

Fees not refunded

If corrections are not made in time, drawings are marked “Not Approved” and the fees paid are not refunded.

Hard to sell or refinance

A building without approval is hard to sell, rent out formally or use to raise a loan.

Source: Lagos State Physical Planning Permit Regulations 2019. Already built without approval? Ask us about regularisation.

Living abroad? Get approved without flying home.

EPPPS lets us apply for you from anywhere. You sign with a registered company, pay into the company account and get WhatsApp updates at every step. We also explain how your tax position works for the application.

I live abroad
Our work

Designs prepared to Lagos approval standards.

Questions

Building approval questions, answered straight.

Is building approval the same as a building permit or planning permit?

Yes. In Lagos, building approval, building permit, building plan approval and planning permit all mean the same thing: the permit LASPPPA issues before you build. After it, Lagos State Building Control Agency (LASBCA) gives a separate authorisation to start construction, which we also handle.

What documents do I need for building approval in Lagos?

For a bungalow on firm ground: survey plan, architectural drawings and site plan, LUPAR, proof of ownership, tax clearance and land use charge receipt. On swampy ground or for two floors and above, add structural drawings, COREN letters and a soil test report. Send us your plan and we’ll give you your exact list.

How much is building approval in Lagos State?

Our fees start from ₦925,000 for a 3 bedroom bungalow and ₦1,710,000 for a 4 bedroom duplex, survey plan included (November 2026). The price depends on your building and LGA. Government fees are separate and paid straight to Lagos State.

How long does approval take?

Your documents are ready in about 3 weeks, or 2 to 3 days on Priority. After submission, timing depends on LASPPPA and on corrections. Files with errors can go back and forth for months. Because we prepare files to approval standard, some of our recent approvals were completed within a month of submission.

Can I apply on EPPPS myself?

Yes, with our Documents Only package. We still correct our documents for free. But each time there is a query, you have to bring it to us, collect the corrected documents and upload them again, and you may have to explain technical points yourself. This back and forth can repeat several times. With Full Approval, we see every query first hand and fix it straight away.

I live abroad. Can my foreign tax documents be used?

It depends on your situation. Foreign tax can sometimes be used, but the process is technical and slow, so applicants abroad are often given an estimated tax assessment. We explain the best option for you before we submit.

What if LASPPPA asks for corrections?

Corrections to our documents are always free. On Full Approval and Priority, we see the query first hand, fix it and resubmit ourselves. On Documents Only, you bring the query to us, we correct it free, and you upload it again.

What happens after I get my permit?

You need a letter of authorisation from LASBCA before construction starts, stage certification during the build, and a certificate of fitness before moving in. We handle all three, and we can build the house for you too.

Is my money safe with you?

You pay only into the account of OME Buildway Contracting Limited, RC 7632487, never into a personal account. You get a written quote and a receipt for every payment.

Send your survey plan. Get your approval price today.

Office: 8a Sanyaolu Street, Oregun, Ikeja, Lagos · Phone: 0707 736 9416 · info@omebuildway.com

SURVEY · APPROVAL · CONSTRUCTION

Built for More. Design. Approve. Build. Develop.

OME Buildway Contracting Limited
8a Sanyaolu Street, Oregun, Ikeja, Lagos
0707 736 9416
info@omebuildway.com
RC 7632487

Office hours

Mon to Fri 8am to 6pm
Sat 9am to 2pm
Sun closed

Follow us

© 2026 OME Buildway Contracting Limited. All rights reserved. Privacy policy · Cookie settings