LASBCA authorisation · Lagos State

Got your planning permit? Get LASBCA authorisation and build without trouble.

A planning permit is not permission to start building. Lagos State Building Control Agency (LASBCA) has its own file, its own fees and an inspection at every stage. We handle all of it with you.

  • We open your LASBCA construction file and submit your permit and documents.
  • We document every stage: photos, concrete, iron, materials and test results.
  • We take you all the way to your certificate of fitness.

RC 7632487 · SURCON registered surveyor · COREN registered engineer · Pay only into the company account

Concrete pour on an OME Buildway construction site in Lagos
Concrete pour on an OME Buildway site

LASBCA authorisation is the go ahead from the Lagos State Building Control Agency to start construction after you get your planning permit. You open a construction file at LASBCA, submit your permit and approval documents, and receive your requirements. LASBCA then inspects every stage, from the start to every floor, and your file must hold photos of each stage, the concrete and iron used, material samples and test results. When the building is finished, you get a certificate of fitness for habitation.

Two different approvals

Planning permit and LASBCA authorisation are not the same thing.

Step one · LASPPPA

Planning permit

Approves your drawings: what you can build on the land, how big, and where. Issued by the Lagos State Physical Planning Permit Authority through EPPPS.

Get your planning permit
Step two · LASBCA

Authorisation, stage certification and fitness

Controls the construction itself: permission to start, inspection at every stage, and the certificate of fitness before anyone moves in.

Open my LASBCA file
The process

From planning permit to certificate of fitness, in six steps.

STEP 1

Planning permit

Your approved drawings and permit from LASPPPA. No permit yet? Start here.

STEP 2

Open your LASBCA file

We take your permit to LASBCA and open a construction file for your building.

STEP 3

Submit documents, get requirements

We tender every approval and permit you have. LASBCA gives the requirements for your building.

STEP 4

Pay LASBCA fees

Paid to Lagos State through the bank, not online. We tell you the amount and how to pay.

STEP 5

Stage inspections

LASBCA inspects from the start to every floor. Each stage is documented in your file before the next one begins.

STEP 6

Certificate of fitness

When the building is finished, the certificate shows everything was done properly. You need it before anyone moves in.

Block work stage documented on an OME Buildway site in Lagos
Every stage is photographed and recorded
LASBCA requirements

What must be in your LASBCA file.

LASBCA expects every stage to be properly documented. Missing records can hold up inspections and your certificate of fitness. We keep the file complete as you build.

  • Your planning permit, approved drawings and approval documents
  • Clear photos of every stage of construction
  • The type of concrete used at each stage
  • Samples of the iron (reinforcement) used on site
  • Samples of other building materials
  • Material test results
  • Inspection records for each stage and floor
Stage certification

Inspected from the start to every floor.

Why it matters

Skip LASBCA and your site can be stopped.

No red marks, no seals

A complete LASBCA file is your protection when inspectors visit your site.

A safer building

Tested materials and inspected stages mean a structure you can trust for decades.

Ready to live in, sell or rent

The certificate of fitness is needed before occupation, and buyers and banks ask for it.

Already got a LASBCA notice? Here is what to do now.

How we help

Pick the level of help you need.

Option 1

LASBCA handling

  • Open your LASBCA construction file
  • Submit your permit and documents
  • Guide you on LASBCA fees and payment
  • Arrange stage inspections and the certificate of fitness

Result: your building is on record with LASBCA from day one.

Recommended
Option 2

LASBCA handling plus supervision

  • Everything in LASBCA handling
  • Our COREN registered engineer supervises every stage
  • Photos, concrete, iron samples and test results recorded for your file
  • Stage reports sent to you on WhatsApp

Result: a complete file and a building you know was built right.

Option 3

We build it for you

  • Everything in options 1 and 2
  • Construction at a fixed price per stage, materials included
  • You pay for each stage only after you see the last one done
  • Certificate of fitness at handover

Result: your keys, with every approval in place.

What it costs

Our fees for LASBCA handling, supervision and construction depend on the type and size of your building, so we quote each one in writing after we see your permit and drawings. LASBCA’s own fees are paid straight to Lagos State through the bank.

Get my quote

Building from abroad? The LASBCA file is your proof too.

The same photos, material records and test results we keep for LASBCA are sent to you at every stage. You see exactly what was built and with what, without flying home.

I live abroad
Questions

LASBCA questions, answered straight.

What is LASBCA authorisation?

It is the go ahead from the Lagos State Building Control Agency to start construction. You get it after your planning permit, by opening a construction file at LASBCA and meeting its requirements.

Do I need LASBCA authorisation if I have a planning permit?

Yes. The planning permit approves your drawings. LASBCA controls the construction itself, with its own file, fees, stage inspections and certificate of fitness.

What are the LASBCA requirements?

Your planning permit and approval documents to open the file, then proper records at every stage: photos, the type of concrete used, samples of iron and other materials, and material test results. LASBCA gives the full list for your building when the file is opened.

How are LASBCA fees paid? Can I pay online?

In our experience, LASBCA fees are paid to Lagos State through the bank, not online. The amount depends on your building. We tell you the amount and how to pay before you start.

Which stages does LASBCA inspect?

Every stage, from the start of construction to every floor, up to completion. Each stage must be documented in your file before you move to the next.

What is a certificate of fitness for habitation?

It is issued when the building is finished, to show everything was done properly. You need it before anyone moves in, and buyers and banks often ask for it.

How much do you charge for LASBCA handling?

It depends on the type and size of your building. LASBCA handling, supervision and construction are quoted separately in writing after we see your permit and drawings.

LASBCA already marked my site. What now?

Stop work, don’t remove the mark or break any seal, and send us photos. See what to do when LASBCA marks or seals your building.

Send us your planning permit. We’ll open your LASBCA file.

No permit yet? Building approval in Lagos · See all costs: Approval cost

Office: 8a Sanyaolu Street, Oregun, Ikeja, Lagos · Phone: 0707 736 9416 · info@omebuildway.com

Built for More. Design. Approve. Build. Develop.

OME Buildway Contracting Limited
8a Sanyaolu Street, Oregun, Ikeja, Lagos
0707 736 9416
info@omebuildway.com
RC 7632487

Office hours

Mon to Fri 8am to 6pm
Sat 9am to 2pm
Sun closed

Follow us

© 2026 OME Buildway Contracting Limited. All rights reserved. Privacy policy · Cookie settings