LASBCA marked your building? Stop work and call us today.
A red mark, a notice, a stop work order or a seal. We know what each one means and the official way to get your building legal and your site working again.
- We check your documents the same day you send them.
- We prepare what’s missing and take you through the official process.
- Act early and avoid bigger penalties, sealing and demolition.
RC 7632487 · SURCON registered surveyor · COREN registered engineer · Pay only into the company account
Do this now
- Stop all work immediately. Once your site is cited, work must stop. It is not a matter of days.
- Don’t remove the mark or break any seal. Breaking a LASBCA seal is a criminal offence.
- Take clear photos of the mark, the notice and the building.
- Send them to us on WhatsApp with every document you have.
When the Lagos State Building Control Agency (LASBCA) cites a site, it usually paints a red mark on the wall and serves a notice. Work must stop immediately. If the owner keeps building, a stop work order follows, then the building is sealed, and it can end in a demolition notice. Penalties are charged from a list, with a fee for each contravention, and they rise with every ignored visit.
How LASBCA enforcement works, and what each stage means for you.
Red mark and notice
Your site has been cited. Stop work now. This is the cheapest point to fix it.
Stop work order
Issued when work continued after the notice. Penalties are higher.
Seal
The building is sealed. Breaking the seal is a crime and the penalty is higher again.
Demolition notice
Usually the last step, when every earlier notice was ignored. Don’t let it get here.
Got a letter from LASBCA? Send us a photo of it.
Every notice says what was found and what you must do. The type of notice tells us how far your case has gone and how urgent it is.
- Contravention notice or red mark: stop work, fix the documents.
- Stop work order: penalties are rising, act today.
- Seal or demolition notice: the last stages. Call us immediately.
How most owners end up with a LASBCA notice.
Went to site without approval
The most common reason. Many people in Lagos start building before getting a planning permit.
Approval abandoned halfway
Some owners have most documents, hit a correction, and go to site anyway. Often we can finish what was started.
The contractor didn’t explain
Some contractors start work straight away and don’t tell the owner approval comes first. The owner pays the price later.
The official way out, step by step.
We review your documents
Send photos and whatever documents you have. Some owners already have most of what’s needed.
We prepare what’s missing
Drawings, survey, structural stability letter from our COREN registered engineer, and an integrity test where needed.
Permit and penalty assessment
We submit for your planning permit and guide you through the official assessment. All fees and penalties are paid to Lagos State through the bank.
Back to work, legally
Once cleared, we handle your LASBCA authorisation so work can continue, with stage certification.
Build it right
We can supervise or take over the remaining stages, so it doesn’t happen again.
No shortcuts
We only use the official process. It protects your building, your money and your name.
How LASBCA penalties are worked out
- LASBCA uses a penalty list. Each contravention has its own fee.
- Fees rise if LASBCA visited more than once and you didn’t respond.
- Ignoring a stop work order or breaking a seal costs more again.
- Planning regulations also add a penal fee on the planning permit itself.
The sooner you act, the fewer items on your list.
What our help costs
We quote in writing after we review your documents and photos, so you only pay for what your building actually needs. Integrity test from ₦110,000 per floor.
Government fees and penalties are set by Lagos State and paid straight to the state. You pay our fees only into the account of OME Buildway Contracting Limited.
Review my caseAbroad and just heard LASBCA came?
Tell your family or site team to stop work and send you photos. Forward them to us. We visit the site, review the documents and handle the process with you on WhatsApp and email.
LASBCA questions, answered straight.
What does the red mark from LASBCA mean?
It means your site has been cited for a contravention, usually building without approval. It comes with a notice, and you must stop work immediately.
Can I keep building after a LASBCA notice?
No. Continuing leads to a stop work order, then sealing, higher penalties and possibly demolition. Stop, then fix the documents.
How much is the LASBCA penalty?
It depends on the contraventions recorded. LASBCA uses a penalty list with a fee for each one, and fees rise with every ignored visit or a broken seal. All penalties are paid to Lagos State through the bank.
Can a LASBCA seal be removed?
Yes, through the official process: the right documents, the planning permit or regularisation, and payment of the assessed penalties. Never break the seal yourself; it is a criminal offence.
Will my building be demolished?
Demolition is usually the last stage, after notices, a stop work order and sealing were ignored. Acting at the first notice gives you the best chance of keeping your building.
I already started approval. Why did LASBCA still come?
A planning permit application is not the same as permission to build. You need the permit and LASBCA’s authorisation before work starts, and stage certification during construction. We can finish both.
How fast can you help?
Send photos and documents on WhatsApp and we review them the same day in office hours, then tell you exactly what’s needed.
Is my money safe with you?
You pay our fees only into the account of OME Buildway Contracting Limited, RC 7632487, and get a written quote and receipts. Government fees go straight to Lagos State.
Don’t wait for the next visit. Send us your photos now.
Building finished without approval? Building regularisation in Lagos · Need approval first? Building approval in Lagos
Office: 8a Sanyaolu Street, Oregun, Ikeja, Lagos · Phone: 0707 736 9416 · info@omebuildway.com
Built for More. Design. Approve. Build. Develop.
OME Buildway Contracting Limited
8a Sanyaolu Street, Oregun, Ikeja, Lagos
0707 736 9416
info@omebuildway.com
RC 7632487