Building regularisation · Lagos State

Built without approval in Lagos? Make your building legal before LASBCA comes.

Finished, half built, or stuck halfway through an approval you abandoned. We get the planning permit for the building you already have, so you can live in it, rent it, sell it or finish it in peace.

  • We check the documents you already have first. Many owners are closer than they think.
  • As built drawings, engineer’s structural stability letter and every document Lagos asks for.
  • We submit on EPPPS and guide you through the official penalty assessment.

RC 7632487 · SURCON registered surveyor · COREN registered engineer · Pay only into the company account

Building in Isheri constructed by OME Buildway
Building by OME Buildway · Isheri

Building regularisation in Lagos means getting a planning permit for a building that was built, or started, without approval. You apply to LASPPPA through EPPPS with as built drawings, a structural stability letter from a registered engineer, a survey plan, title and tax documents. Outside an amnesty, penalties apply. As of November 2026, no amnesty is open; the last one ended on 31 December 2025.

30+Approvals completed
CORENEngineer signs your structural letter
20Lagos LGAs covered
15 minWhatsApp reply in office hours
As featured in BusinessDay Registered with CACSURCONCOREN
Is this you?

Most buildings without approval fall into one of these.

01

Finished, never approved

You built and moved in, but never got the permit. Now you want to sell, rent formally or refinance.

02

Building now, no permit

Work is going on without approval. Act before LASBCA visits, because once your site is cited, work must stop.

03

Approval started, then abandoned

You had most documents, hit a correction or delay, and went to site anyway. We pick up from what you have.

04

Contractor said it could wait

Some contractors start work without approval and don’t explain the risk. It’s not too late to fix it properly.

Why act now

Waiting makes it more expensive.

Penalties grow

LASBCA charges from a penalty list, with a fee for each contravention. Ignored visits, stop work orders or a broken seal each add more.

Enforcement follows amnesty

When the last amnesty windows closed, enforcement and demolitions followed. Don’t wait for the next one.

Your building is stuck

Without a permit it’s hard to sell, rent formally, use for a loan or get a certificate of fitness.

Waiting for an amnesty?

Lagos ran penalty free amnesty windows in 2024 and from November to December 2025. None is open now (November 2026). Get your documents ready today, and we’ll message you the day a new amnesty is announced so you can file first.

Tell me when it opens
What you need

Documents for regularisation in Lagos.

Regularising means getting the approval documents again, this time for the building as it stands, plus proof that it is structurally safe.

We prepare

  • As built architectural drawings of the building as it is
  • Structural fitness and stability letter from a COREN registered engineer
  • Integrity (non destructive) test where needed, from ₦110,000 per floor
  • Survey plan (or we check yours)
  • LUPAR and the EPPPS application

You provide

  • Proof of ownership: C of O, Governor’s Consent or deed
  • Tax clearance
  • Land use charge receipt
  • Any approval documents you already started
  • Photos of the building and any LASBCA notice
How it works

From no approval to a legal building, in five steps.

STEP 1

Send what you have

Photos of the building and every document you already have, on WhatsApp. We tell you what’s missing.

STEP 2

We inspect the building

Our team and COREN registered engineer check the structure and measure it as built.

STEP 3

We prepare the documents

As built drawings, structural stability letter, integrity test if needed, survey and LUPAR.

STEP 4

We submit and handle queries

We submit on EPPPS, answer every query and guide you through the official assessment. All fees and penalties are paid to Lagos State through the bank.

STEP 5

Permit, then fitness

With your permit in hand, we help you finish properly with LASBCA and get your certificate of fitness.

Still building?

We can supervise or take over the remaining stages, with stage certification, so the rest of your building is done right.

Price

What regularisation costs

Every building is different, so we price after we see your documents and photos. You get a written quote before you pay anything.

  • Our fees: as built drawings, structural letter, survey and processing, quoted in writing after review. Integrity test from ₦110,000 per floor.
  • Government fees: the assessment fee plus any penalty, set by Lagos State from its penalty list. Paid straight to Lagos State through the bank, never to us in cash.
Get my quote
Living abroad

Built back home while you were abroad?

Many diaspora owners only find out later that their building has no approval. We handle the whole process on WhatsApp and email, and our team visits the building for you.

Questions

Regularisation questions, answered straight.

What is building regularisation in Lagos?

It is getting a planning permit for a building that was built or started without approval. Lagos treats it as a planning permit application for the building as it stands, with extra proof that the structure is safe.

Is there a Lagos building amnesty now?

No. As of November 2026, no amnesty is open. The last one ran from November to December 2025, and one ran in 2024. We’ll message you if a new one is announced.

How much does regularisation cost?

Our fees are quoted in writing after we review your documents and photos; the integrity test starts from ₦110,000 per floor. Government fees and any penalty are set by Lagos State and paid straight to the state through the bank.

What documents do I need?

As built drawings, a structural stability letter from a registered engineer, survey plan, proof of ownership, tax clearance and land use charge receipt. Where needed, an integrity test report. We prepare the technical documents for you.

My building isn’t finished. Can I still regularise?

Yes. If LASBCA hasn’t visited, apply now before they do. If your site has been marked or given a notice, stop work immediately and talk to us first.

Will my building be demolished?

Buildings that meet minimum planning and safety standards can usually be regularised. Buildings that don’t may need changes, and serious cases can be removed. The earlier you act, the more options you have.

LASBCA has already marked my building. What now?

Stop work, don’t remove the mark or break any seal, take photos and send them to us. See our page on what to do when LASBCA marks or seals your building.

Is my money safe with you?

You pay our fees only into the account of OME Buildway Contracting Limited, RC 7632487. Government fees are paid straight to Lagos State. You get a written quote and receipts.

Send us photos of your building. We’ll tell you what it needs.

Need approval before you build? Building approval in Lagos

Office: 8a Sanyaolu Street, Oregun, Ikeja, Lagos · Phone: 0707 736 9416 · info@omebuildway.com

Built for More. Design. Approve. Build. Develop.

OME Buildway Contracting Limited
8a Sanyaolu Street, Oregun, Ikeja, Lagos
0707 736 9416
info@omebuildway.com
RC 7632487

Office hours

Mon to Fri 8am to 6pm
Sat 9am to 2pm
Sun closed

Follow us

© 2026 OME Buildway Contracting Limited. All rights reserved. Privacy policy · Cookie settings